Drinking water flushing plan: what goes in it and who writes it

Saying that water runs regularly in the building is not an answer anyone accepts at an inspection. Anyone asking will want to know which outlet is flushed how often, who does it and where it is recorded. The drinking water flushing plan answers exactly that, and it does so for every outlet in the building.

A drinking water flushing plan sets out, for every outlet, how often it is flushed, who flushes it and where each flush is recorded. Under VDI 6023 (German hygiene standard for water installations), water should not stand anywhere for longer than 72 hours. Where there are special requirements, as in hospitals and care homes, the limit is shorter. The plan should be written by a competent person to fit the building and how it is used; responsibility stays with the operator, who keeps the records in the operations log.

This page is about the paper, not the flushing itself. How to flush, for how long and in what order is covered in our article on Legionella flushing in drinking water systems, known in Germany as Hygienespülung.

What goes into a drinking water flushing plan

A usable plan answers six questions, and you can check each one against your own building.

Which outlets

All of them: washbasins, the assisted bathroom, staff showers, kitchenettes, cleaning-room sinks and the tap in the basement. Sorted by floor and room, the way the pipes run, with cold and hot water listed separately.

How often

Wherever normal use does not replace the water, every 72 hours at the latest, and more often in care homes and hospitals. That includes the room of a resident who is washed in bed.

Which outlets run together

A single open tap will not get the water in the corridor pipe moving enough. For each riser, the pipe that serves several rooms stacked above each other, the plan states which outlets run at the same time.

Who does the flushing round

One name and one deputy per area.

How each flush is recorded

Date, time, outlet and initials, plus anything unusual and what was done about it. Best written during the flush, not at the end of the shift.

Vacancy, building work, closures

The plan already says what applies when a room stands empty after a move-out, or a whole living area does. What to do on the day of reopening is covered in our article on flushing water pipes after a shutdown.

Decision aid

Does someone need to flush here?

1 2 Yes 3 No
  1. Is the water here, cold and hot, replaced in everyday use more often than your flushing interval requires?
  2. Yes: everyday use is enough. The outlet stays on the list in case its use changes.
  3. No: the outlet goes into the flushing round, with a name, an interval and an entry in the flushing record.
Based on VDI 6023. Own illustration.

When does the plan need updating?

As soon as anything changes about the outlets or how they are used, whoever keeps the plan updates it and notes what changed and when. In a care home it takes very little: two double rooms become single rooms, a living area becomes a unit for people with dementia, an assisted bathroom is added. A plan from five years ago then describes a home that no longer exists in that form. In a hospital, a ward moving or patient rooms taking on a new use is enough.

Who writes the flushing plan under VDI 6023 and who answers for it

The planner or another competent person writes the plan, for this specific building and this specific use. A template with only the name swapped is not enough.

Responsibility stays with the facility as the operator, even when a specialist firm writes the plan or does the flushing. That is why the names belong in the operations log: who flushes, who covers, who checks the entries and who keeps the plan up to date. The plan itself states, with dates, who drew it up and who approved it. It should be signed by someone who knows the plan.

The samples for Legionella testing, on the other hand, are taken by an approved testing body, in other words a laboratory.

In hospitals and care homes, the drinking water hygiene plan should be agreed with a hygienist and the Gesundheitsamt (local public health authority) as early as the planning stage. Day to day, it helps when the head of technical services and the infection control nurse go through the flushing plan together. More on our page on drinking water hygiene in hospitals.

Where does the flushing plan belong?

The term "flushing plan" does not appear in Germany's drinking water ordinance. The ordinance requires the installation to be operated in line with recognised engineering standards, and the plan comes from those standards. It is part of the drinking water hygiene plan and sits in the operations log, the file of every piece of work, measurement and lab result on the installation. Under those standards, you keep the operations log for the entire life of the building.

You have a hygiene plan anyway, because Germany's Infection Protection Act requires one of care homes and hospitals alike. Drinking water can be a chapter of its own within it.

If there is no plan at all, ask the planner or the specialist firm for the documents or have it written from scratch; if necessary, specialists will first walk the building and list every outlet. What else should be written down in advance is covered in our article on Legionella outbreaks in care homes and hospitals.

Intention and evidence

A flushing plan shows what should happen. Only what has been recorded counts as evidence.

What ends up on the table at an inspection

For drinking water, the inspecting body is the Gesundheitsamt. It also monitors the drinking water installation of care homes and hospitals, decides for itself how often it comes, and is not supposed to announce its visits in advance.

Among the documents it may inspect are the laboratory reports and the current technical drawings of the system. Flushing records are not named on that list. Even so, the best way to show that water is kept moving in your building is with two things: the plan that says what should happen, and the entries that show it did. What else a care home has to be able to show is covered on our page on drinking water hygiene in care homes.

Test yourself before the next inspection

Take three outlets from the plan, including one that hardly anyone uses, and look up the latest entries for them.

  • Did the water there never stand longer than your plan allows?
  • Are there initials on every entry?
  • Are there outlets in the building that do not appear in the plan at all?

The gap you find that way is the same gap an inspector would find.

How to keep the plan working day to day

There are three ways to put it into practice:

  • Paper list in the operations log: costs nothing, but is only as good as the moment it is filled in.
  • Digital checklist on a tablet: time-stamps every entry, but someone still has to walk the round.
  • Automatic flushing device: nobody has to walk the round; what matters is that it records every flush.

It makes no hygienic difference whether a person or a device replaces the water. With an automatic device, what counts is that every single flush can be shown.

For the showers, Aqvior's hygiene flush device for exposed shower installations is one option. It sits behind the existing shower valve and flushes as soon as no water has run at that shower for 72 hours; in hospitals and care homes the interval can be set shorter. Every flush is logged in the Web-Dashboard with time, duration and water temperature, without anyone having to remember to write it down.

The plan then states which showers the device flushes and where the record is kept.

Frequently Asked Questions

Is a flushing plan template from the internet enough?

As a framework, yes; as a plan, no. The drinking water ordinance does not mention the flushing plan and therefore prescribes no form for it. The plan should, though, be written for your building and its use: with your outlets, your risers and the names of the people who actually do the flushing.

What intervals does a flushing plan set against Legionella?

The rule is that water should not stand for longer than 72 hours at any outlet, whether it is replaced through normal use or by flushing. Where there are special requirements, for example in hospitals and care homes, the technical rules require shorter intervals; the plan sets the interval that applies in your building. When the 72 hours start counting is explained in a separate article; how long each flush takes is covered in our article on Legionella flushing.

Does an automatic flushing device replace the flushing plan?

No, it changes it. The plan then states which outlets are flushed automatically and where the record is kept. What to settle before buying such a device is covered in our questions before you buy.

Do rarely used washbasins and staff showers belong in the flushing plan?

Yes. The 72-hour rule applies to every outlet in the building, including the one that someone passes only every few weeks. The staff shower in the basement, the washbasin in the visitors' toilet or the sink in the cleaning room easily drop out of a flushing round that was planned around residents' rooms.

Every shower flush with its own record

When a shower hasn't been used for 72 hours, our device runs the water by itself and saves a record of every flush.

Test it now

A record per shower · Interval can be set shorter · Fitted without bathroom renovation